The project concerns the hydro-agricultural development of 1,500 net hectares in the Niger River valley, in the communes of Malanville and Karimama, the first component (Lot 1) of the program to develop 12,000 hectares in the Niger, Mono and Ouémé valleys.
The planned works include: two pumping stations (Malanville: 1,500 l/s; Karimama: 3,400 l/s), two drainage water pumping stations (1,500 and 2,500 l/s), two head and stilling basins (4,650 m³ and 7,480 m³), an irrigation network of 128 km of open canals, a drainage and sanitation network of 300 km and 110 km of access tracks.
Our mission
The Consultant’s services include:
- feasibility study and preliminary design (APS);
- detailed design study (APD), including topographic surveys, socio-economic study, geotechnical study and soil study;
- environmental and social impact assessment;
- preparation of the bidding documents.