Project
The Project comprises three components:
- Component 1:
Construction of a 60 MW heavy and light fuel oil power plant in Farcha, near N'Djaména. The duration of the works contract is 24 months.
- Component 2:
Construction of a 66 KV double trunk line, 40 km long, from the Djarmaya refinery power plant to the 66/90 KV substation in N'Djaména, and construction of a 66/90 KV substation in N'Djaména. The duration of the works contract is 24 months.
- Component 3:
Construction of the 60 km 90 KV loop around N'Djaména (42 km of overhead lines and 18 km of underground cable), 4 90 KV/15 KV substations at Pont Bélilé, Farcha, N'Djaména and Gassi, MV (250 km) and LV (300 km) distribution networks in N'Djaména, with 74 prefabricated 15 KV/400 V substations and 25 pole-mounted substations for the connection of 10. 000 subscribers and 4,000 street lamps, and the construction of a national dispatching centre in N'Djaména. The duration of the works contract is 36 months.
Our mission
- Verification and approval of execution plans drawn up by contractors
- Acceptance of equipment and materials in factories and on site;
- Supervision, monitoring and permanent control of civil, electrical and mechanical engineering work for 36 months
- Supervision of commissioning;
- Provisional acceptance of work
- Follow-up during the 12-month warranty period:
- Final acceptance of work.